Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 9 results ...

Blismas, N, Pasquire, C and Gibb, A (2006) Benefit evaluation for off-site production in construction. Construction Management and Economics, 24(02), 121-30.

  • Type: Journal Article
  • Keywords: Benefits; evaluation; off-site production; pre-assembly; value
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/01446190500184444
  • Abstract:

    Evaluating to what extent a component or building system should be produced off-site is inadequate within the industry. The potential benefits of off-site production (OSP) are commonly cited when justifying an OSP approach, yet holistic and methodical assessments of the applicability and overall benefit of these solutions, to a particular project, have been found to be deficient. Common methods of evaluation simply take material, labour and transportation costs into account when comparing various options, often disregarding other cost-related items such as site facilities, crane use and rectification of works. These cost factors are usually buried within the nebulous preliminaries figure, with little reference to the building approach taken. Further, softer issues such as health and safety, effects on management and process benefits are either implicit or disregarded within these comparison exercises. Yet it is demonstrated that these issues are some of the most significant benefits of OSP. A series of case studies demonstrated that evaluation focus is almost solely on direct material and labour costs of components, without explicit regard for the wider cost or soft issue implications of OSP on a project. The paper argues that until evaluation is more holistic and value-based rather than cost-based, OSP uptake in construction will be slow.

Chang, A S and Tien, C-C (2006) Quantifying uncertainty and equivocality in engineering projects. Construction Management and Economics, 24(02), 171-84.

Edwards, D J and Holt, G D (2006) Hand-arm vibration exposure from construction tools: results of a field study. Construction Management and Economics, 24(02), 209-17.

Leishman, C and Warren, F (2006) Private housing design customization through house type substitution. Construction Management and Economics, 24(02), 149-58.

Lingard, H and Francis, V (2006) Does a supportive work environment moderate the relationship between work-family conflict and burnout among construction professionals?. Construction Management and Economics, 24(02), 185-96.

Manoliadis, O, Tsolas, I and Nakou, A (2006) Sustainable construction and drivers of change in Greece: a Delphi study. Construction Management and Economics, 24(02), 113-20.

Muya, M, Price, A D F and Edum-Fotwe, F T (2006) Overview of funding for construction craft skills training in Sub-Saharan Africa: a case study of Zambia. Construction Management and Economics, 24(02), 197-208.

Shohet, I M and Paciuk, M (2006) Service life prediction of exterior cladding components under failure conditions. Construction Management and Economics, 24(02), 131-48.

Zhang, H, Li, H and Tam, C M (2006) Heuristic scheduling of resource-constrained, multiple-mode and repetitive projects. Construction Management and Economics, 24(02), 159-69.